Links: Secondary Navigation
Construction Notices and Maps
Welcome to the Construction Notices and Maps webpage. Below you’ll find links to three different maps. The first map includes all planned summer construction projects as of April 25, 2013. The next two maps detail only the construction projects underway during the noted timeframes.
Campus and Area Maps
Campus and Area Maps
Full Summer Construction Map
- Download the full-sized map - 3 MB (PDF)
Updated 04/25/13
Summer Construction Map for May 16-22, 2013
- Download the full-sized map - 3 MB (PDF)
Summer Construction Map for May 23-29, 2013
- Download the full-sized map - 3 MB (PDF)
These maps are intended for informational purposes only. Please refer to the dates noted on each of the maps and check this site on a regular basis to access the most current notices and maps.
Note: For the most current area information, please see City and State transportation websites.
Construction Notices
New Notices
- Graduate Parking Garage Closed Until Early August
- Fencing Near Materials and Electrical Engineering Until Early August
- Lift Near Armory Blocks Sidewalks on May 16
- S. Martin Jischke Drive Closure May 20-21
Ongoing Campus Notices
- Parking Spaces Closed in Stadium Lot R
- Wooden Drive Closure, Tower Drive Traffic Direction Change
- Construction Fencing on Math Sciences Plaza
- Stair Tread Replacement on East Stairway of Purdue Memorial Union
- UPDATE: S. University Street Project Affects Parking and Through Traffic
- UPDATE: Multiple Projects on Northwestern Avenue
- Drive Closure North of Brown and Wetherill May 20-28
- Slayter Hill Parking Area Closed until Early August
- Parking Garage Cleaning Schedule
- Sidewalk Closure on East Side of Biomedical Engineering
- US 231 Lane Restrictions Begin April 1, Continue to August
- Temporary Fencing in Mathematical Sciences Plaza
- VFH and CSEL Construction Closes Sidewalks, Removes Parking
- Parking Lot Closed South of Life Science Range Building
- Parking Lots Closed off of Service Drive Near BSG and ABE