Advertisement for Bids

Questions may be directed to the Capital Program Management group at (765) 494-9130.

The first published newspaper ad will typically run five weeks prior to the bid opening, and the second ad will typically run three weeks prior to the bid opening.

West Lafayette

November 12, 2015

  • West Lafayette Campus – Hampton Hall Towing Tank Renovation – 2015
  • West Lafayette Campus – Stewart Center Smoke Vent Enclosure Renovation – 2015
  • West Lafayette Campus – Whistler Hall Elevator 41179 Renovation – 2015
  • West Lafayette Campus – Zucrow High Pressure Research Lab Test Cell Construction and Control Center Renovation/Addition – 2015

December 3, 2015

  • West Lafayette Campus – Elliott Hall Smoke Vent Dog House Replacement – 2015
  • West Lafayette Campus – Haas Hall Elevator 42871 Renovation – 2015
  • West Lafayette Campus – University Hall Soffit Repair and Painting – 2015

December 17, 2015

  • West Lafayette Campus – Hicks Library East Elevators 41178 and 41176 Renovation – 2015
  • West Lafayette Campus – Math Sciences Building Sanitary Sewer Piping Replacement – 2015
  • West Lafayette Campus – McCutcheon Drive Parking Garage Repairs – 2015
  • West Lafayette Campus – Nelson Hall Roof Sections A, B, C, D, and E Replacement – 2015

January 7, 2016

  • West Lafayette Campus – Meredith Hall Sections C, D, E, F, J, K and M and Tarkington Hall East Wing Roof Replacement – 2016
  • West Lafayette Campus – Purdue Memorial Union Slate Roof Tile Replacement Phase VII – 2016
  • West Lafayette Campus – Shealy Hall Gutter Downspout Roof and Masonry Repairs – 2016
  • West Lafayette Campus – Wiley Hall Wing Elevator Repair – 2016

January 21, 2016

  • West Lafayette Campus – Beering Hall Roof Replacement – 2016
  • West Lafayette Campus – Haas Hall Soffit, Gutter and Downspout Repair – 2016
  • West Lafayette Campus – Harrison Hall Back Dock Brine Tank Repairs – 2016
  • West Lafayette Campus – Physics Building Rooms B10, B11, B11A, B12, B13, & B13A Renovation (DL2) – 2016
  • West Lafayette Campus – Purdue Memorial Union Masonry Repair Phase II – 2016
  • West Lafayette Campus – Wade Utility Plant Roof Drain Piping Repair and Roof Sections B, C, L and R Replacement – 2016
  • West Lafayette Campus – Wiley Hall Transformer and Switchgear Replacement – 2016

February 4, 2016

  • West Lafayette Campus – Cary Quad Northeast Building Fire Alarm Replacement – 2016
  • West Lafayette Campus – Cary Quad South Hall Roof Replacement Phase I – 2016
  • West Lafayette Campus – Horticulture Building Exterior Masonry Tuck Pointing and Caulking – 2016
  • West Lafayette Campus – Horticulture Building Roof Replacement – 2016
  • West Lafayette Campus – Zucrow Lab Water Supply Line Replacement – 2016

February 18, 2016

  • West Lafayette Campus – Bechtel Innovation Design Center – 2016
  • West Lafayette Campus – Lambert Fieldhouse Masonry Repairs Phase II – 2016
  • West Lafayette Campus – Multiple Building Tunnel Top Replacement, Waterproofing and Repair – 2016
  • West Lafayette Campus – Wade Utility Plant Boiler 5 Dry Sorbent Injection System Installation – 2016

February 25, 2016

  • West Lafayette Campus – Animal Disease Diagnostic Lab and Smith Hall Roof Replacement – 2016
  • West Lafayette Campus – Centennial Mall Sitescape and Utility Tunnel Repair – 2016
  • West Lafayette Campus – Reflection Park – 2016

February 25, 2016

  • West Lafayette Campus – Water Tower Rehabilitation – 2016

March 3, 2016

  • West Lafayette Campus – Forest Products Building Storm Sewer Replacement – 2016
  • West Lafayette Campus – Johnson Hall and Michael Golden Labs Fire Alarm Replacement – 2016
  • West Lafayette Campus – Lynn Hall Chilled Water Line Installation and Room 2228 AHU ACP-C Replacement – 2016
  • West Lafayette Campus – Marstellar Street Parking Garage Demo and New Parking Lot Installation – 2016

March 17, 2016

  • West Lafayette Campus – Campus Wide Utility Tunnel Lighting Replacement Phase III – 2016
  • West Lafayette Campus – Harrison Street Sewer Line Replacement – 2016

Calumet

February 4, 2016

  • Purdue University Calumet – North Campus Switchgear Replacement – 2016

Fort Wayne

February 4, 2016

  • Indiana University-Purdue University Fort Wayne Campus – Walb Union Rooms 121, 123, 125 Renovation – 2016

February 18, 2016

  • Indiana University-Purdue University Fort Wayne Campus – Ginsberg Hall Roof Replacement Phase 1 – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Kettler Hall 2nd Floor Student Study Lobby Renovation – South Campus Renovations – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Kettler Hall Accessibility Renovations – DMSS – 2016

March 3, 2016

  • Indiana University-Purdue University Fort Wayne Campus – Helmke Library Restroom Renovations-South Campus Renovations – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Kettler Hall Student Services Renovations-DMSS – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Kettler Hall Classroom Renovations-DMSS – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Kettler Hall East Entrance and Stair Renovation – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Kettler Hall Domestic Water Piping Replacement-DMSS – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Kettler Hall Fire Protection and Alarm System Renovation-DMSS – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Kettler Hall Telecommunications Data Cable Replacement – South Campus Renovations – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Liberal Arts Building Classroom Renovations-DMSS – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Neff Hall Classroom Renovations-DMSS – 2016
  • Indiana University-Purdue University Fort Wayne Campus – Science Building Classroom Renovations-DMSS – 2016

North Central

None at this time