  • Cary Quad East Exterior Masonry Restoration - 2014
  • Hansen Hall Fire Alarm Replacement - 2014
  • Mechanical Engineering Building And Lynn Hall Tunnel Repairs - 2014Northwestern Parking Garage First Floor And Basement Renovation - 2014
  • Ross-Ade Stadium Structural Steel Repairs - 2014
  • Wade Utility Plant Boiler No. 2 Conversion (PDI) - 2014

Cary Quad East Exterior Masonry Restoration - 2014

BiddersLocationComplete Construction Base BidAlternate(s)

Bulley & Andrews, LLC

Indianapolis, IN

$611,000.00

No. 1: 19,500.00
No. 2: 72,600.00
No. 3: 99,600.00
No. 4: 27,718.00

Detroit Cornice & slate Company, Inc.

 

Ferndale, MI

$366,380.00

No. 1: 25,500.00
No. 2: 27,700.00
No. 3: 145,000.00
No. 4: 33,000.00

Trisco Systems, Inc.

Lima, OH

$527,443.00

No. 1: 15,211.00
No. 2: 35,231.00
No. 3: 88,281.00
No. 4: 29,793.00

Alternate No. 1 – State the amount to be added to the Base Bid remove and replace mismatched brick masonry as required by the Contract Documents.

Alternate No. 2 – State the amount to be added to the Base Bid to perform limestone cleaning as required by the Contract Documents.

Alternate No. 3 – State the amount to be added to the Base Bid to perform repairs to the masonry garden walls as required by the Contract Documents.

Alternate No. 4 – State the amount to be added to the Base Bid to perform repairs to the northeast entrance of Cary Southeast as required by the Contract Documents.


Hansen Hall Fire Alarm Replacement - 2014

BiddersLocationComplete Construction Base Bid

Long Electric Company,
Inc

Indianapolis, IN

$169,400.00


Mechanical Engineering Building And Lynn Hall Tunnel Repairs - 2014

BiddersLocationComplete Construction Base BidAlternate(s)

F.A. Wilhelm Construction Co., Inc.

Indianapolis, IN

$230,000.00

No. 1: 4,000.00
No. 2: 16,200.00
No. 3: 85,000.00
No. 4: 13,300.00 

Kettelhut Construction, Inc.

Lafayette, IN

$298,000.00

No. 1: 3,200.00
No. 2: 6,900.00
No. 3: 115,000.00
No. 4: 14,700.00

Mid-States General & Mech. Contr. Corp.

 Lafayette, IN

 $440,000.00

No. 1: 13,000.00
No. 2: 18,000.00
No. 3: 150,000.00
No. 4: 30,000.00

Alternate No. 1 – State the amount to be added to the Base Bid to replace the wall and door into the Mechanical Engineering (ME) Building Lateral.

Alternate No. 2 – State the amount to be added to the Base Bid to replace the tunnel access hatch at Lynn Hall.

Alternate No. 3 – Deduct from the Base Bid the cost of all work at the Mechanical Engineering (ME) Building Lateral.

Alternate No. 4 – Deduct from the Base Bid the cost of all crack/joint injection at Lynn Hall.


Northwestern Parking Garage First Floor And Basement Renovation - 2014

BiddersLocationComplete Construction Base BidAlternate(s)

Mid-States General & Mech. Contr. Corp.

Lafayette, IN

$385,000.00

No. 1: 10,600.00
No. 2: 5,000.00

Alternate No. 1 – State the amount to be added to or deducted from the Base Bid to replace all laminate doors (new and replacement for existing) with solid core wood doors and finishes. Prep replacement doors, and reuse existing door hardware and frames.

Alternate No. 2 – State the amount to be added to or deducted from the Base Bid to re-lamp all existing light fixtures indicated on the drawings to remain.


Ross-Ade Stadium Structural Steel Repairs - 2014

BiddersLocationComplete Construction Base BidAlternate(s)

Glenroy Construction Co., Inc.

Indianapolis, IN

$512,000.00

No. 1: 170,000.00
No. 2: 71,000.00
No. 3: No Change

F.A. Wilhelm Construction Co., Inc.

Indianapolis, IN

$440,000.00

No. 1: 90,969.00
No. 2: 41,932.00
No. 3: 6,118.00

Alternate No. 1 – State the amount to be added to the Base Bid to perform the following general tasks:

1. Complete removal of existing traffic coating membrane at all vomitories. The steel shall be cleaned and prepared according to SSPC-SP11 or SSPC-SP11R. Complete recoating of all vomitories with a new traffic coating membrane.
2. Surface preparation and spot recoatig of heavily corrosion stained areas with a new traffic coating membrane beyond the vomitories. The contractor shall include 500 square feet of total recoating.

Alternate No. 2 – State the amount to be added to the Base Bid to remove and replace the gutter lining and piping system beneath six expansion joints throughout the stadium. This work includes spot abatement of lead paint.

Alternate No. 3 – State the amount to be deducted from the Base Bid to complete all Base Bid painting work as shown in the drawings using the alternate painting system in Specification Section 09 90 00.03 – PAINTING: ALTERNATE #3.


Wade Utility Plant Boiler No. 2 Conversion (PDI) - 2014

BiddersLocationComplete Construction Base Bid

Frenk Lill & Son, Inc.

Victor, NY

$4,177,997.00

Freitag-Weinhardt, Inc.

Terre Haute, IN

$3,542,000.00

J.R. Kelly Company, Inc.

Lafayette, IN

$2,863,000.00