Tabulation of Bids

March 20, 2014

  • Purdue Memorial Union Masonry Repairs - 2014
  • Smalley Center Sections A & C Roof Replacement- 2014


Purdue Memorial Union Masonry Repairs - 2014

BiddersLocationComplete Construction
Base Bid
Alternate(s)

The Blakley Corporation

Indianapolis, IN

$440,673.00

No. 1: $74,496.00

No. 2: $83,751.00

Bulley & Andrews, LLC

Indianapolis, IN

$353,303.00

No. 1: $142,032.00

No. 2: $123,032.00

Detroit Cornice & Slate Company, Inc.

Ferndale, MI

$485,322.00

No. 1: $99,863.00

No. 2: $69,935.00

General Restoration Corpoation

Columbus, IN

$469,200.00

No. 1: $84,500.00

No. 2: $58,900.00

Alternate No. 1 – State the amount to be added to or deducted from the Base Bid for repairs to the southeast elevation as required by the Contract Documents.

Alternate No. 2 – State the amount to be added to or deducted from the Base Bid for repairs to the southwest elevation as required by the Contract Documents.



Smalley Center Sections A & C Roof Replacement- 2014

BiddersLocationComplete Construction 
Base Bid
Alternate(s)

Hinshaw Roofing & Sheet Metal Co., Inc.

Frankfort, IN

$130,000.00

No. 1: $10,800.00

No. 2: $9,200.00

No. 3: $31,600.00

No. 4: $5,200.00

Nu-Tec Roofing Contractors, LLC

Indianapolis, IN

$172,400.00

No. 1: $23,700.00

No. 2: $19,900.00

No. 3: $29,800.00

No. 4: $7,300.00

Alternate No. 1 – State the amount to be added to or deducted from the Base Bid to furnish and install fixed single point fall protection anchors and horizontal lifeline in lieu of a moveable cart system as required by the Contract Documents.

Alternate No. 2 – State the amount to be added to or deducted from the Base Bid to furnish and install a fixed roof access ladder with a lockable secutiry gate as required by the Contract Documents.

Alternate No. 3 – State the amount to be added to or deducted from the Base Bid to furnish and install tapered insulation at ¼ inch per foot slope in lieu of 1/8 inch per foot slope specified under the Base Bid. Furnish and install taller perimeter blocking/curbs, pipe extensions and coated metal fascia to accommodate increased insulation thickness as required by the Contract Documents.

Alternate No. 4 – State the amount to be added to or deducted from the Base Bid to utilize SBS premium cap sheets and SBS premium base sheets in lieu of standard base and cap sheets as specified under the Base Bid. Upgrade flashing details per the roofing manufacturer’s standard details as required and provide a 25 year no-dollar-limit total systems warranty in lieu of the 20 year specified in the Base Bid as required by the Contract Documents.