Tabulation of Bids

March 13, 2014

  • Owen Hall Sections G and M Roof Replacement - 2014
  • Wiley Hall Sections G and M Roof Replacement - 2014
  • Stadium Avenue Tunnel Replacement and Stadium Mall Tunnel Repairs and Waterproofing Phase II - 2014


Owen Hall Sections G and M Roof Replacement - 2014

BiddersLocationComplete Construction
Base Bid

Alternate(s)

Construct Solutions, Inc.

Indianapolis, IN

$452,438.00

No. 1: $24,228.00

Hinshaw Roofing & Sheet Metal Co., Inc.

Frankfort, IN

$482,900.00

No. 1: $20,400.00

Horning Investments, LLC d/b/a Horning Roofing & Sheet Metal Co., LLC

Indianapolis, IN

$490,870.00 

No. 1: $23,570.00

Nu-Tec Roofing Contractors, LLC

Indianapolis, IN

$608,700.00

No. 1: $24,000.00

Alternate No. 1 – State the amount to be added to or deducted from the Base Bid to remove the existing ductwork insulation jacket and provide new ductwork insulation jacket to identified ductwork as shown on the drawings and specified herein.



Wiley Hall Sections G and M Roof Replacement - 2014

BiddersLocationComplete Construction Base Bid

Alternate(s)

Construct Solutions, Inc.

Indianapolis, IN

$482,483.00 

No. 1: $72,167.00
No. 2: $45,877.00

Hinshaw Roofing & Sheet Metal Co., Inc.

Frankfort, IN

$604,425.00 

No. 1: $82,895.00
No. 2: $42,000.00

Horning Investments, LLC d/b/a Horning Roofing & Sheet Metal Co., LLC

Indianapolis, IN

$449,621.00  No. 1: $67,000.00
No. 2: $44,000.00*
Korellis Roofing, Inc.

 Hammond, IN

$449,994.00

No. 1: $53,359.00
No. 2: $37,777.00

Nu-Tec Roofing Contractors, LLC

Indianapolis, IN

$574,700.00 No. 1: $104,700.00
No. 2: $59,700.00

*Bid as read in figures was $44,500.00

Alternate No. 1 – State the amount to be added to or deducted from the Base Bid to remove the existing ballasted EPDM roof system on Roof Area P of Wiley Hall and install new 2 ply modified bitumen roof system as shown on the drawings and specified herein.

Alternate No. 2 – State the amount to be added to or deducted from the Base Bid to remove the existing ductwork insulation jacket and provide new ductwork insulation jacket to identified ductwork as shown on the drawings and specified herein.



Stadium Avenue Tunnel Replacement and Stadium Mall Tunnel Repairs and Waterproofing Phase II - 2014

BiddersLocationComplete Construction
Base Bid
Alternate(s)
Kettelhut Construction, Inc.

Lafayette, IN

$545,000.00

No. 1: $90,000.00

No. 2: $96,000.00

No. 3: $114,000.00

No. 4: $121,000.00 

No. 5: $99,000.00

Mid-States General & Mech. Contr,. Corp.

Lafayette, IN

$526,000.00

No. 1: $109,000.00

No. 2: $107,000.00

No. 3: $129,000.00

No. 4: $134,000.00

No. 5: $111,000.00

Alternate No. 1 – State the amount to be added to the Base Bid to perform Exterior Repairs and Traffic Coating from Forney Hall north to Stadium Avenue (approximately 1,050 LFT).

Alternate No. 2 – State the amount to be added to the Base Bid to perform Interior Repairs from tunnel top/wall replacement (Stadium Avenue) south to PUSH Lateral (approximate tunnel stationing N17+41 to N13+51; 390 LFT).

Alternate No. 3 – State the amount to be added to the Base Bid to perform Interior Repairs from PUSH Lateral south to PHYS Lateral (approximate tunnel stationing N13+51 to N09+96; 355 LFT).

Alternate No. 4 – State the amount to be added to the Base Bid to perform Interior Repairs from PHYS Lateral south to End of Project at N06+65 including interior repairs in the Schleman Lateral and Forney Lateral (432 LFT).