Tabulation of Bids

February 6, 2014

  • Hilltop Apartments Buildings 11, 12 and 13 Kitchen and Bath Renovations - 2014
  • Purdue Memorial Union Main Floor HVAC Modifications Phase I - 2014


Hilltop Apartments Buildings 11, 12 and 13 Kitchen and Bath Renovations - 2014

BiddersLocationComplete Construction
Base Bid
Alternate(s)
Glenroy Construction Co,Inc. Indianapolis, IN $495,000.00

No. 1: $145,000.00
No. 2: $8,100.00
No. 3: $1,600.00

J.R. Kelly Company, Inc. Lafayette, IN $459,800.00

No. 1: $132,500.00
No. 2: $8,000.00
No. 3: $1,600.00

Terstep Company, Inc. Fishers, IN $436,000.00

No. 1: $150,000.00
No. 2: $8,000.00
No. 3: $2,000.00

Alternate No. 1 – State the amount to be added to or deducted from the Base Bid to renovate Building 13.

Alternate No. 2 – State the amount to be added to or deducted from the Base Bid to provide electrical receptacle and extension cord in each unit for Buildings 15-21. Electrical receptacle located on wet wall of kitchenette. Split circuit for range. Access is available at range and junction box located in Dressing Room.

Alternate No. 3 – State the amount to be added to or deducted from the Base Bid to provide electrical receptacle and extension cord in each unit for Building 22. Electrical receptacle located on wet wall of kitchenette. Split circuit for range. Access is available at range and junction box located in Dressing Room.



Purdue Memorial Union Main Floor HVAC Modifications Phase I - 2014

BiddersLocationComplete Construction Base BidAlternate(s)
Commercial Air Inc. Lebanon, IN $689,000.00

No. 1: $59,000.00
No. 2: $17,000.00

D.A. Dodd, Inc. Rolling Prairie, IN $829,000.00

No. 1: $62,900.00
No. 2: $19,600.00

Quality Plumbing & Heating of Bunker Hill, Inc. Bunker Hill, IN $714,000.00

No. 1: $59,000.00
No. 2: $18,000.00

Shambaugh & Son, L.P., Ed Grace Division Lafayette, IN $757,100.00

No. 1: $53,220.00
No. 2: $12,500.00

Alternate No. 1 – State the amount to be added to or deducted from the Base Bid to install chilled water pump (CHWP-A1) including strainer, check valve, equipment pad, electrical connection, tool crib fencing, controls, and all other items required for the complete installation of this pump.

Alternate No, 2 – State the amount to be added to or deducted from the Base Bid to replace existing condensate pump in its entirety including all piping, valves electrical, insulation, concrete housekeeping pad and all other items required for a complete installation of this pump.