Tabulation of Bids

March 25, 2014

  • Coliseum Entrance Roadway Modification Phase 2 - 2014
  • Holiday Inn Hospitality Kitchen Renovation - 2014


Coliseum Entrance Roadway Modification Phase 2 - 2014

BiddersLocationComplete Construction
Base Bid
Alternate(s)
Brooks Construction Company, Inc.

Fort Wayne, IN 

$200,717.00 

No. 1: $34,707.00

Wayne Asphalt & Construction Co., Inc.

Fort Wayne, IN 

$198,000.00

No. 1: $37,795.00

 T-E Incorporated

Fort Wayne, IN 

$206,000.00 

 No. 1: $37,000.00 

 API Construction Corp.

Laotto, IN

$232,218.00

 No. 1: $43,019.00

Alternate No. 1 – State the amount to be added to or deducted from the Base Bid to provide all work associated with modifying and constructing a portion of the storm sewer as reflected in the site drawings including butnot limited to: site demolition, sewer piping, pavement removal and replacement, seeding, and any associated special backfill.



Holiday Inn Hospitality Kitchen Renovation - 2014

BiddersLocationComplete Construction Base BidAlternate(s)
Signature Construction by Mike Ley, LLC

Auburn, IN

$124,000.00

No. 1: +$17,700.00

Robert E,. Crosby, Inc.

Fort Wayne, IN 

$105,980.00

No. 1: +$16,000.00

Strebig Construction, Inc.

Fort Wayne, IN 

$109,364.00

No. 1: +$16,345.00 

C3 Construction Services, LLC

Fort Wayne, IN

$96,300.00

No. 1: +$19,400.00

Alternate No. 1 – State the amount to be added to or deducted from the Base Bid to remove all wall base and VCT flooring (move all kitchen equipment to install equipment). Prep floor and install new epoxy floor coating with integral base.