Proposal
Preparation Validation Rules

1. For
NIH proposals, the base for academic year salary plus the summer
salary base cannot exceed the NIH salary cap, which changes annually
(see following link). http://www.adpc.purdue.edu/SPS/html/nihsacpf.html
2. For
NIH research proposals, trainee/fellowship costs such as stipends,
travel trainee/participants, and tuition and fees are normally not
allowable.
3. If
graduate students are budgeted at an effort > 50%, then
graduate student insurance should be budgeted.
4. If
graduate students are budgeted, then graduate fee remissions should
be budgeted.
5. If
subcontracts are budgeted, a work statement, budget, and an
institutional signature (Sponsored Program Equivalent) from each
subcontractor need to be included in the proposal.
6. If
scientific equipment or general-purpose equipment is budgeted, a
justification needs to be included in the proposal.
7. If
stipends are budgeted, tuition and fees need to be included.
8. If
clerical personnel, general purpose equipment, and/or office
supplies are budgeted, are unlike circumstances justified in the
proposal?
9. Make
sure the correct F&A rate is used for the specified activity type (Research, Instruction, Other Sponsored Program).
10. If
there is Other or Memo cost sharing listed in the proposal, there
must be a form 32 and box #12 must be filled out on the transmittal
check sheet.
11. If
PI effort is zero, then SPS should mark VCS in the system
12. If
foreign travel is budgeted, then is the trip justified in the
proposal?
13. If
the proposal is for an industrial sponsor and the direct cost is <
$10,000,then F&A should be zero.