High Voltage Project
Lilly Hall
Schedule | Milestones | Photos
Schedule:
Milestones:
- Upcoming shutdowns:
- Lilly West: The 240 volt three phase electrical service will be shutdown on Friday, November 20, 2009, at 9 p.m., until Saturday, November 21, 2009, at 5 p.m. This will affect items such as fume hoods, chemical storage in fume hoods, exhaust fans, AHUs, elevator #3 and occurs in the west wing of the building.
- Lilly Penthouse south : Monday November 23 at 5:30 p.m. This one will last for approximately 1-2 hours and will only affect the penthouse 230 volt three phase.
- Lilly West : Monday November 30 at 7 p.m. This one will shutdown the entire west wing and will last for 1-2 hours.
- Lilly South: Friday December 4 at 6 p.m. This one will shutdown the entire south wing and will last for 2-4 hours.
- Lilly South laydown:
On November 30 and December 1, 8 spots on each side (16 total) of the parking lot between Lilly and Smith Halls will be blocked. From December 2 through the end of the project, only 7 spots on the west side and 3 spots on the east side (10 total) will be blocked.
- Lilly West laydown:
A map of the contractor laydown area and location of the portable substations:
|