HIGH VOLTAGE PROJECT

Founders Park Ductbank (serves Stone Hall and Matthews Hall)

The ductbank at in Founders Park (see map) will connect Manhole 13-1 to the tunnel that connects the Stone and Matthews vaults.

This site is now complete.

founders ductbank
6/29: The ductbank is complete. The replacement concrete will be restored once the switch installation in the manhole is finished.
founders ductbank
A new switch has been installed in the manhole, requiring an electrical shutdown of the TEL building. Generators provided power during this shutdown.


June 12: The area excavated for the ductbank.



June 9: The concrete has been cut for this project, and fencing has been set up to protect the area. It is a small section of sidewalk and should cause minimal disruption to pedestrian traffic.

 

 

 

 
purdue homepage
purdue search purdue maps purdue directories

Copyright © 2005, Purdue University, all rights reserved.
An equal access/equal opportunity university.
Purdue University, West Lafayette, IN 47907 USA, (765) 494-4600