Updated: December 2013

 

Please direct any questions about items in this table to Robin Ridgway  rmridgway@purdue.edu     
  

 

  
  

Item of Concern

  
  

Purpose for Concern

  
  

Min Lead Time Required

  
  

Governing Regulatory Program

  

1

Incinerators of any variety

Need permit from IDEM

6   months

Purdue   Part 70 Permit/ “Title V”

2

Particulate   pollution control equipment (baghouses, filters) for processes NOT directly associated   with non-profit research and teaching

Need permit from IDEM

6   months

Purdue   Part 70 Permit/ “Title V”

3

Paint Spray Booths

Need permit from IDEM

6   months

Purdue   Part 70 Permit/ “Title V”

4

Fugitive   Emissions: e.g., vapors from a manufacturing process or a for profit research   activity.

Need permit from IDEM

6   months

Purdue   Part 70 Permit/ “Title V”

5

Heaters/Boilers:

●  Natural Gas any size (> 10 MBTU/hr needs   a permit)

●  Coal >1 MBTU/hr

●  Propane > 6 MBTU/hr

●  Oil Fired > 2 MBTU/hr

●  Wood > 1 MBTU/hr

Need Permit from IDEM

Need to add all boilers to inventory

6   months

Purdue   Part 70 Permit/ “Title V”

6

Electric   Generators (not able to be moved by hand):

●  Gasoline > 82 kw (110 hp)

●  Diesel > 1,200 kw (1,600 hp)

●  Natural Gas > 12,000 kw (16,000   hp)

Construction Permit Needed

Need to add to inventory for reporting and recordkeeping

6   months

326   IAC 2-1.1-3

7

Electric generators, any fuel any size (>500 brake horsepower (373 kW) needs   notification)

Specific design Requirements

na

Purdue   Part 70 Permit/ “Title V”: RICE MACT

8

Electric Generators fuel storage

Possible design Considerations for containment, update SPCC

na

Campus   SPCC

9

Transformers containing >50 gallons oil

Possible design Considerations for containment, update SPCC,(possibly SWPPP)

na

Campus   SPCC; MS4 permit

10

Ventilation   systems intended to remove hazardous vapors or particulate (dust) from a   production process NOT associated with research and teaching.  E.g., a hood in a research lab does not   need a specific permit, but a hood in a maintenance area does.

Need permit from IDEM

6   months

Purdue   Part 70 Permit/ “Title V”

11

Construction activities that generate large quantities of vapor or particulate (building   implosion)

Need  permit from IDEM, possibly SWPPP

6   months

Fugitive Dust; MS4 permit

12

Internal combustion engines > 200 brake horsepower

Specific  design and Notification Requirements

na

Purdue Part 70 Permit/ “Title V”: RICE MACT

13

Internal combustion engines > 500,000 BTU/hr combined

Specific  design and Notification Requirements

na

Purdue Part 70 Permit/ “Title V”: RICE MACT

14

Process/chlorinated water discharged to the ground or storm sewer:

  •   gray water,
  •   compressor blow down,
  •   cooling tower blow down,
  •   vehicle cleaning water,
  •   aircraft deicing
  •   filter backflush
  •   deionized water backflush

Permit needed; specific design requirements

3   months

NPDES   permitting program (Phase II); groundwater rules; wellhead protection program

15

Dry wells; French drains

Specific design Requirements

na

NPDES permitting program (Phase II); groundwater rules; wellhead protection program

16

Runoff   waters from areas such as salt storage or coal storage

Permit   needed; specific design requirements, possibly SWPPP

na

NPDES Phase II

17

Erosion control construction site > ½ acre

 

Permit needed; specific design requirements

na

NPDES Phase II

18

Work in or near waterways or potential wetlands areas (e.g., Todd’s Creek, Jordan   Creek)

Permit/mitigation may be required

varies

Wetland,   floodplain regulations

19

Wastewater treatment systems

 

Permit needed; specific design requirements

6   months

NPDES,   WLaf WWTP

20

Wastewater sewer mains

Permit   needed; specific design requirements

45   days

IDEM,   WLaf WWTP

21

Septic systems of ANY variety

Permit needed; specific design requirements

6   months

County   Health Dept; NPDES Phase II

22

Discharges to sanitary sewer not meeting pretreatment requirements

specific design requirements

na

WLWWTP   pretreatment program

23

 

Underground storage tanks

 

specific design requirements; permit requirements

6   months

NPDES   Phase II, well head protection, UST program

24

 

Above ground storage tanks

 

Possible design Considerations for containment, update SPCC

na

Campus   SPCC

25

●  Hazardous waste storage tanks

●  Hazardous waste storage containers greater than 100-gallons

●  90-day hazardous waste storage area

●  On-site treatment or destruction of   hazardous waste

●  On-site recycle, reuse, or reclamation of   hazardous materials

specific design requirements; permit requirements

 

RCRA   Permit

26

Work in the area of solid waste management units

Specific procedures required

varies

Closed   landfill requirements

27

Land application of waste or secondary materials

Permit required

na

Land   Application Permit

28

Pesticide storage facilities

 

specific design requirements; permit requirements

 

Pesticide   Program

 

29

Water main extension

 

IDEM permit or notice of intent required for compliance

 

45   days

 

IDEM

 

30

Well-head protection issues for location to well fields

 

Maintain safe drinking water in well head protection area

 

30   days

 

IDEM

31

 

Installation of geothermal wells

Protection of Public Water Supply

6   months

SDWA   Wellhead Protection

32

Any addition/change to Animal Science Research (ASREC) that modifies/adds to   existing manure management infrastructure and current animal numbers and/or adds buildings of any sort

Verification of a manure management plan; permit modification, construction permit

6   months

IDEM   Confined Feeding Approval; CAFO NPDES permit

33

Work in FAA runway safety zones at airport

FAA regulations

6   months

FAA   regulations

34

Demolition of structures of any sort that may contain asbestos or lead paint.

Permit required, licensed contractor required

6   months

IDEM   asbestos program

35

Will there be a generator removed from this project that will be available for   salvage/reuse/resale?

 

 

 

 

 