Project Title: BCHM Room 116 Lab and Office Renovation-2010
Project ID: 9273
Website Status Update
The functions previously performed by the Office of the University Architect (OUA) are now addressed by Physical and Capital Planning (P&CP), Project Management and Construction (PM&C), and Energy and Engineering Services (EES). The P&CP website is available here. The Energy and Engineering Services website is available here. A new PM&C website is currently under development, however, essential information will be maintained in this location until the new website is launched. Thank you for your patience as these enhancements are completed.
Client: Biochemistry
Scope: Renovate lab space in Room 116. Remove base cabinets on east island. Rework islands for knee space sections. Install lab cabinets with epoxy top. Install new door and drawer fronts and shelving. Replace floor tile as needed. Install new cup sinks and bench sink with hot, cold, and RO water. Install bench mounted turrets for new utilities. Tie into existing air, gas, and water. Install new lights under first row of shelves at each bench. Install additional receptacles. Paint walls.
Construction Start: April 5, 2010
Construction Finish: June 11, 2010
Project Manager: Joni Heide
Design & Engineering by: Physical Facilities
Construction Work by: Operations & Maintenance
O&M Coordinator: Doug Wagner
O&M Crew Chief:
Location: S. University St.
Photos:
|