Project Title: TCOM Duct Bank Cable Installation
Project ID: 11355
Website Status Update
The functions previously performed by the Office of the University Architect (OUA) are now addressed by Physical and Capital Planning (P&CP), Project Management and Construction (PM&C), and Energy and Engineering Services (EES). The P&CP website is available here. The Energy and Engineering Services website is available here. A new PM&C website is currently under development, however, essential information will be maintained in this location until the new website is launched. Thank you for your patience as these enhancements are completed.
Client: Information Technology Networks & Security
Scope: Remove an AKF 200-24 calbe from the 4" conduits in the duct bank from the tunnel at ADDL through existing conduits and manholes down to manhole 6400. Cable is to be removed from splices at both ends and pulled out at closest midpoint manhole and neatly coiled for reinstallation in the existing 4" dut that contains an AKF400-22 cable. Once pull is compete, resplice 200-pair cable, label and test.
Construction Start: August 9, 2010
Construction Finish: September 10, 2010
Project Manager: Craig Dice
Design & Engineering by: Physical Facilities
Construction Work by: PIC Shop
Location: S. University St.