Project Title: Stadium Mall Landscaping and Sustainable Storm Water Modifications (SIUI)
Project ID: 10848
Website Status Update
The functions previously performed by the Office of the University Architect (OUA) are now addressed by Physical and Capital Planning (P&CP), Project Management and Construction (PM&C), and Energy and Engineering Services (EES). The P&CP website is available here. The Energy and Engineering Services website is available here. A new PM&C website is currently under development, however, essential information will be maintained in this location until the new website is launched. Thank you for your patience as these enhancements are completed.
Client: Physical Facilities
Scope: Remove existing asphalt drive, improve campus storm water system and install lawn between walks with crosswalks, in accordance with teh campus-wide master plan/study for sustainable storm water modifications. Work includes but is not limited to: demolition of existing asphalt drive, installation of storm water cistern, rain gardens, and tree trenches as part of upgrade of existing drainage, installation of porous hard surfaces, and final landscaping.
Construction Start: May 17, 2010
Construction Finish: August 13, 2010
Project Manager: Grant Colella
Design by: Scheider Corp.
Construction by:
Location: Stadium Mall Drive
Photos:
|