Project Title: KNOY Room 148 Space Renovation
Project ID: 10760

Website Status Update

The functions previously performed by the Office of the University Architect (OUA) are now addressed by Physical and Capital Planning (P&CP), Project Management and Construction (PM&C), and Energy and Engineering Services (EES). The P&CP website is available here.  The Energy and Engineering Services website is available here. A new PM&C website is currently under development, however, essential information will be maintained in this location until the new website is launched. Thank you for your patience as these enhancements are completed.

Client: COT Administration

Scope: Demo existing built in lockers, transport to salvage. Demo concrete curb at south and west locations, infill area with stain finished concrete. Finish bulk head and back walls at west, south and north east sections where lockers were removed, this will include recessed lighting, sprinklers, receptacles, drywall, new 16" counter, trim and stainless steel kick late. Fabricate and install custom literature display at the north east section. Install steel studs and drywall flush with curb and bulk head south east section of removed lockers. Install 24" deep work surface on two sides of existing column, install two receptacles and apply new surface finish to column. Paint entire area.

Construction Start: January 11, 2010

Construction Finish: August 27, 2010

Project Manager: Ken Jacobs

Design & Engineering by: Physical Facilities

Construction Work by: Operations & Maintenance

O&M Coordinator: Doug Wagner

O&M Crew Chief: Darrell Burton

Location: N. Grant St. and Northwestern Ave.

 