Project Title: Armory Parking Lot Paving and Sustainable Storm Water Modifications (SIUI)
Project ID: 10651
Website Status Update
The functions previously performed by the Office of the University Architect (OUA) are now addressed by Physical and Capital Planning (P&CP), Project Management and Construction (PM&C), and Energy and Engineering Services (EES). The P&CP website is available here. The Energy and Engineering Services website is available here. A new PM&C website is currently under development, however, essential information will be maintained in this location until the new website is launched. Thank you for your patience as these enhancements are completed.
Client: Physical Facilities
Scope: Improve campus storm water system and install new porous asphalt paving at the parking lot north of the Armory, in accordance with teh campus-wide master plan/study for sustainable storm water modifications. Work includes but is not limited to: demolition of existing base lot, installation of storm water infiltration bed, rain gardens, and tree trenches as part of upgrade of existing drainage, fine grading installation of porous hard surfaces, lighting, and final landscaping.
Construction Start: May 31, 2010
Construction Finish: October 13, 2010
Project Manager: Grant Colella
Design by: Scheider Corp.
Construction by:
Location: University St. between Fourth and Fifth Streets