Project Title: Lynn Hall Storm Water and Trench Drain Redirection
Project ID: 10550

Website Status Update

The functions previously performed by the Office of the University Architect (OUA) are now addressed by Physical and Capital Planning (P&CP), Project Management and Construction (PM&C), and Energy and Engineering Services (EES). The P&CP website is available here.  The Energy and Engineering Services website is available here. A new PM&C website is currently under development, however, essential information will be maintained in this location until the new website is launched. Thank you for your patience as these enhancements are completed.

Client: Office of the University Architect

Scope: Remove existing trench drain, concrete pad, and approximately 20 feet of curb and gutter at the west entrance to the large animal clinic. Set 2 new gutter inlets as shown on the drawing and connect them to the existing 12" storm sewer line with a 10" PVC schedule 80 sewer line. Pour new curb and gutters around the new inlets and the section on the north side of the entry way. Place new asphalt for the entryway.

Construction Start: May 17, 2010

Construction Finish: June 14, 2010

Project Manager: Julie Hickman

Design & Engineering by: Physical Facilities

Construction Work by: C&C Excavating

Location: Harrison St. at Marstellar St.

 

 

 

 

 